Language:

Pipeline 

 

The planned pipeline is designed to link the ground processing facility in gas fields in Ethiopia to the LNG plant in Djibouti.The total length of the pipeline will be around 700 km, and will be of the type DN 1016mm/10 Mpa,with an annual throughput capacity of 14 billion cubic meters. As a vital part of the whole industry chain, gas pipeline is an key channel to connect upstream and downstream facilities.

Copyright©2014 POLY-GCL Petroleum Group Holdings Limited .All rights reserver Designed by webfoss